RV14

RV14
Vans RV-14

Sunday, 16 April 2017

Empennage - Vertical Stabilizer Assembly

Finally getting to a position where the Vert Stab is coming together.

The second Main Spar and Doubler were prepared again and primed. This time, all the rivets were installed on the correct side...























While squeezing the AN426AD4 rivets where the VS-702 Front Spar joins VS-704 & VS-705 ribs, the squeezer scratched the front spar. This was partly due to the <90 degree angle between VS-704 and the rib 



These scratches will need to be sanded smooth and re-primed. Awkward spot.

When riveting the VS-705 rib to the front spar with AD4 rivets, the flange bent away slightly. It's not much but I'll make sure this is inspected prior to assembly.



The Vertical Stabilizer skeleton partly riveted, partly clecoed...

2 comments:

  1. Hey Jericho,
    I just started on my RV14a vertical stabilizer and I am having dramas squeezing the long rivets. Wondered if you had a few pointers. I am in Brisbane by the way.

    Cheers,

    Kieran

    ReplyDelete
  2. Hi Kieran,
    Sorry for slow response. You've most likely figured something out by now. Which rivets were you having trouble with?
    I'd be happy to catch up some time. Send me a message on my email if you wish - jasonc310@gmail.com

    ReplyDelete